Outside the sanitary zone
Not every clean-in-place loop in a sanitary plant is sanitary. The utility side of process exchangers, the tank farm, rendering and by-product lines, cosmetics and chemical blending, the pet food kitchen and wastewater pretreatment all get cleaned with hot caustic or acid, and none of it needs 32 Ra or a tri-clamp. The heater on those loops is an industrial CIP exchanger: 316 on the solution side because the chemistry is as strong or stronger, carbon steel or stainless shell, flanged, removable or fixed bundle, rated 250 psig at 400 F so it takes 150 psig plant steam without a reducing station.
The parent page covers sanitary CIP heaters. This page is about the larger, rougher duty: where the loop is switched in, the plate versus shell-and-tube choice at 500 to 2,000 gpm, and what stronger chemistry does to gaskets.
At the cleaning window, manual or automated valves close the process loop and open the CIP loop; the CIP pump draws from a solution tank through the heater to the equipment, and the return comes back to the tank or to drain. The heater is sized on the loop flow, set by velocity in the largest line, and on the rise from tank temperature to setpoint in one pass. On a 1,000 gpm loop lifting caustic from 120 F to 190 F that is 35 million Btu/h and a heater with a 6 in steam valve.
A gasketed plate gives the cheapest area on a hot-water-to-solution duty and opens for gasket change, which it will need: EPDM in 5 percent caustic at 190 F lasts two to four years. On steam a plate is limited by its gaskets to about 300 F and by its frame to modest pressure, so above 50 psig steam the heater is a shell-and-tube. A U-tube with steam in the tubes takes 150 psig with no expansion joint and pulls for inspection; a fixed-tubesheet unit is cheaper but needs a shell expansion joint for the 300 degree cycle and cannot be pulled.
The 250 psig, 400 F rating in the standard build covers the steam side without a reducing station and covers the solution side against a CIP pump chosen for a long loop. Code and certification requirements for industrial CIP heaters are set out on our industrial CIP pages.
Industrial loops run 3 to 5 percent caustic where a sanitary skid runs 1 to 2, add chlorinated alkaline cleaners for protein and nitric or sulfamic acid for scale, and some lines flush with solvent between campaigns. 316 handles the caustic and acids; chlorinated cleaners at 180 F attack any stainless at crevices, which is the argument for welded tubes over rolled and a drain that empties the shell between cycles. Gaskets are EPDM, or PTFE-lined where solvent is in the program.
A fixed-tubesheet shell-and-tube bought on price for a steam-heated loop with no expansion joint. The first ten cycles are fine. The cycling from 60 F to 350 F on the tubes against a shell that stays at 200 F works the tube-to-tubesheet joints, and by month six the steam side is leaking into the caustic. On steam it is a U-tube bundle or a fixed unit with a shell expansion joint, and HeatX quotes the joint as standard rather than as an option.
Call and talk it through with an engineer: 1-805-484-2992
This is the heavier build for cleaning loops outside the sanitary zone, where the duty and the chemistry are both larger. Set your chemical strength and steam supply against it and send them with the quote request.
| Condition | Detail |
| Fluid | 2 to 5 percent caustic, 1 to 2 percent nitric or phosphoric acid, chlorinated alkaline cleaners, solvent flush on some lines |
| Flow range | 200 to 2,000 gpm; 5 to 70 million Btu/h |
| Temperatures in / out | Ambient or 120 F to 180 to 200 F |
| Hold | 30 to 60 minutes at return temperature; longer on baked-on soils |
| Utility | Plant steam at 50 to 150 psig, or hot water or hot oil loops |
| Approach | Not limiting on steam; 10 degrees on hot water plate duties |
| Construction | Removable-bundle U-tube on steam; fixed tubesheet with expansion joint on hot water; gasketed plate on water-to-solution |
| Finish / class | 316 tubes, tubesheets and channels; carbon steel or 304 shell; flanged 150 or 300 class; mill finish |
| Ratings | 250 psig at 400 F both sides in the standard build |
| CIP / SIP | Self-cleaning by the loop; drained between cycles; no sanitary requirement |
Yes, whenever the steam pressure inside the tubes falls below the back pressure on the condensate line. At part load the control valve throttles until the steam is only as hot as the duty needs; holding a 150 F loop at low flow may take steam at 180 F, which is a vacuum of about 7.5 psia inside the tubes, and no vacuum pushes condensate through a trap into a return line at 5 psig. Condensate backs up the bundle, the outlet temperature wanders, and the slugs hammer the tube joints. The cure is a pump-trap or a vented receiver with a condensate pump at the heater, sized for the stall load, or a vacuum breaker and gravity drain where the receiver can sit below the heater. On a U-tube with steam in the tubes, specify it at the quote; retrofitting it means repiping.
As a scheduled consumable: a full set on the shelf and the whole pack changed at once. EPDM in 5 percent caustic at 190 F gives two to four years, so a plate in that service is regasketed two to four times in a decade. Mixing new and old gaskets compresses the pack unevenly and the old ones leak first, which is how a plant ends up opening the frame three times in a year. Store spares cool, dark and away from motors, and specify clip-on gaskets so the change is a shift, not a weekend.
Through it, yes; heated in it, not unless the solvent's flash point sits well above the steam temperature on the other side of the tube. With 150 psig steam the tube wall is near 366 F, above the flash point of most process solvents, so the sequence closes and locks out the steam valve before the flush and interlocks it with the solvent pump. Drain the rinse water from the shell first so the flush is not diluted, and specify PTFE-envelope gaskets on the solution side because EPDM swells in most solvents. Name the solvent on the quote; the gasket and the drain arrangement follow from it. Pipe the shell vent to a safe location as well, since solvent vapor collects there.
Run it as cool as the soil allows, rinse fully before any acid, and drain the heater after every cycle. Hypochlorite meeting nitric or phosphoric acid releases chlorine gas, so the intermediate rinse is a safety step. On the exchanger, chloride left in a tube-to-tubesheet crevice overnight at temperature is what pits 316, and chloride stress corrosion cracking of austenitic stainless becomes a concern above about 140 F, so a loop that holds chlorinated cleaner at 180 F is a candidate for 2205 duplex tubes. Welded rather than rolled tube joints take the crevice out; a shell drain at the true low point takes the puddle out. Name the cleaner and its strength on the quote.
Split-range steam valves: a small one for trim and low flow, a large one that opens only after the small one is wide. That duty is about 40,000 lb/h of 150 psig steam at full fire, and a single valve sized for it runs at a few percent of travel when the loop is at a third of design flow, where valve gain is highest and the loop cycles. Feedforward from the loop flow meter lets the controller set the valves ahead of a circuit switch. State the lowest flow the loop will ever run so the small valve is sized for it.
Set it by the chemistry: first pull in the first year on strong chlorinated or acid programs, then by what that pull finds. Look at the tube ends at the tubesheet and at baffle contact lines for pitting, and at the shell low point for a tide line that says it has not been draining. A hydrostatic test at the same shutdown confirms the joints before the next campaign. A loop on plain caustic and phosphoric acid can go three to five years between pulls.
The steam-to-solution heater on the skid, its steam trim, and how the tank count changes what it has to do.
+ Learn More
Which CIP heaters are product-contact equipment, what the symbol changes, and when it is money wasted.
+ Learn More
What comes back from the circuit at 170 F has to go down the drain at 140 F, and the heat is worth keeping.
+ Learn More