Raw Milk Cooling Heat Exchangers

Receiving bay and farm coolers on well and chilled water.

Contact us

Receiving, farm and silo

The first exchanger the milk ever sees

Raw milk leaves the cow at 100 F and has to be at 45 F within two hours and at 40 F or below to keep its count down. On a farm that is a plate precooler on well water ahead of the bulk tank. At a plant it is a receiving cooler that takes tanker milk at 38 to 60 F into the silo at 36 to 38 F, or a silo loop cooler that pulls the silo back down after a warm load.

None of these duties involve heating, holding or regulation. They are pure cooling on a thin fluid, decided by the utility, the peak load and the plate gap.

Sizing for the water you have and the load you will see

Farm precoolers on well water

A farm milking 300 cows delivers milk at 98 F at 10 to 15 gpm, and the bulk tank compressor is sized on the temperature it receives. A single-section plate cooler on 55 F well water at twice the milk flow brings the milk to 60 to 62 F and cuts the tank's refrigeration load by more than half. The water leaves at 70 to 75 F and goes to the stock waterers, which is why the ratio stops at two to one.

Sizing is done on the warmest well water of the year and the fastest milking. A second section on chilled water from the tank's own condensing unit can land 40 F before the tank. The unit is 10 to 30 plates on a small frame.

Receiving bay coolers

Tanker milk arrives at 38 to 45 F in winter and up to 60 F after a long haul in August. The receiving cooler sees the whole tanker at pump rate, 200 to 400 gpm for 20 minutes, then nothing until the next one. It is sized on 60 F milk in, 34 F chilled water at 2.5 times the milk flow; on the winter tanker it loafs.

The peak surprises people. Cooling 400 gpm from 60 F to 37 F is about 4.4 million Btu/h, 370 tons of refrigeration, for 20 minutes. No plant has that idle, so an ice bank or chilled water tank carries the peak and the cooler is sized for the water temperature at the end of the pull. A tower water first section takes 20 to 30 percent off the chilled peak. Cooling duties further along the plant, from the pasteurizer outlet to filled product, are covered on our dairy cooling pages.

  • Size on the August tanker and end-of-pull chilled water
  • Tower water first section where it runs under 70 F
  • Frame with 20 percent spare plate room
98°F
farm milk down to 60 F on well water
34°F
chilled water for 36 to 38 F into silo
370 tons
of refrigeration during a 20-minute tanker pull
400 gpm
receiving bay peak; farm 5 to 60

Silo loops and 36 F

A silo at 38 F takes a warm tanker and drifts to 41 F. The loop cooler pulls the silo through a plate cooler and back, 100 to 200 gpm at a 2 to 3 degree drop per pass, for an hour after each warm load. Getting to 36 F rather than 38 F needs glycol, because 34 F chilled water cannot hold a 3 degree approach on a big load. Plants that want the extra two days of raw milk life put the silo loop on glycol and keep the receiving cooler on chilled water.

The common mistake

Sizing the receiving cooler on the average tanker and the morning chilled water temperature. The cooler lands 37 F all winter and 43 F on the third tanker of an August afternoon when the ice bank is spent, and the silo count climbs. HeatX sizes on 60 F milk and the chilled water temperature at the end of the plant's worst hour; if the plant does not know that number, it is the first question to answer.

Send the tanker pump rate, the warmest milk you receive, the water available and the silo temperature you want.
Call and talk it through with an engineer: 1-805-484-2992

Raw milk cooling process conditions

This table sets out what a farm precooler, a receiving bay cooler and a silo loop are each sized for, and the utility behind each. Find the closest case to yours and send the milk and water you actually have.

Condition Detail
Product Raw whole milk, 3.5 to 4.5 percent fat, 2 cP at 70 F
Flow range Farm 5 to 60 gpm; receiving bay 100 to 400 gpm; silo loop 50 to 200 gpm
Temperatures in / out Farm 98 F to 60 F on well water; bay 40 to 60 F in, 36 to 38 F out
Hold None; single pass, seconds of residence
Utility Well water at 50 to 60 F; tower water; chilled water at 34 F; glycol for 36 F
Approach 3 to 5 degrees chilled water to milk; 5 to 8 on well water
Construction Gasketed plate, one or two sections; straight tube where brushable
Finish / class 3-A plates, 316L, 32 Ra, nitrile or EPDM gaskets
Pressure Product 50 to 100 psig; utility 100 psig with well pumps
CIP Daily on the farm; each shift at the plant

From the Plant Floor

Trend the approach, milk outlet minus chilled water inlet, at the same tanker pump rate each week; a widening approach with a clean milk side means the water side is fouling. A cooler designed at a 3 degree approach that now runs 6 degrees on the same 34 F water lands 40 F instead of 37 F, and on an August afternoon that becomes 43 F. CIP never touches the chilled side, so scale and biofilm from the chilled loop build there undisturbed. Open the frame once a year and inspect the water side, and check the chilled water flow at the same time, because a throttled balancing valve looks exactly like fouling on the trend.

A raw-side circuit with the receiving lines and silos, never one that also serves pasteurized equipment. Clean it at least as often as the PMO requires for raw milk equiptment, which in a busy bay means after the last tanker of each shift rather than once a day. Raw milk soil at 40 to 60 F is light protein and fat, so a standard caustic and acid program removes it. The mistake is letting the cooler sit hours after the last tanker with a milk film drying on the plates; that film is harder to remove and feeds the count on the next load.

Only if the chilled water supply can carry the larger peak, which is usually the real limit. More plates narrow the approach, but at the end of a heavy receiving hour the ice bank is spent and the water arrives at 38 F instead of 34 F, and no plate count lands 37 F milk on 38 F water. Check the ice bank or chiller recovery first. If it keeps up, adding plates is cheap, and a tower water front section of 20 to 30 percent of the frame takes load off the chilled water in the same move.

Related

Cream Heating and Cooling Heat Exchangers

Applications

Cream Heating & Cooling

Half and half to heavy cream, heated to 166 F and cooled to 40 F without churning, feathering or channeling.

+ Learn More
Whey and Permeate Heat Exchangers

Applications

Whey & Permeate

Sweet and acid whey, UF and RO permeate: cooled off the vat, warmed for the membrane, preheated to evaporate.

+ Learn More
Condensed and Evaporated Milk Heat Exchangers

Applications

Condensed & Evaporated Milk

Forewarmers, evaporator preheaters and concentrate coolers for milk at 30 to 50 percent solids, to 5,000 cP.

+ Learn More

Quote Request Form:

Questions?

1-805-484-2992